Type: fix
Ticket: VPP-1756
the block-size was set to 0 resulting in incorrect placement of the ESP
footer.
add tests for NULL encrypt + integ.
Change-Id: I8ab3afda8e68f9ff649540cba3f2cac68f12bbba
Signed-off-by: Neale Ranns <nranns@cisco.com>
Enhance the route add/del APIs to take a set of paths rather than just one.
Most unicast routing protocols calcualte all the available paths in one
run of the algorithm so updating all the paths at once is beneficial for the client.
two knobs control the behaviour:
is_multipath - if set the the set of paths passed will be added to those
that already exist, otherwise the set will replace them.
is_add - add or remove the set
is_add=0, is_multipath=1 and an empty set, results in deleting the route.
It is also considerably faster to add multiple paths at once, than one at a time:
vat# ip_add_del_route 1.1.1.1/32 count 100000 multipath via 10.10.10.11
100000 routes in .572240 secs, 174751.80 routes/sec
vat# ip_add_del_route 1.1.1.1/32 count 100000 multipath via 10.10.10.12
100000 routes in .528383 secs, 189256.54 routes/sec
vat# ip_add_del_route 1.1.1.1/32 count 100000 multipath via 10.10.10.13
100000 routes in .757131 secs, 132077.52 routes/sec
vat# ip_add_del_route 1.1.1.1/32 count 100000 multipath via 10.10.10.14
100000 routes in .878317 secs, 113854.12 routes/sec
vat# ip_route_add_del 1.1.1.1/32 count 100000 multipath via 10.10.10.11 via 10.10.10.12 via 10.10.10.13 via 10.10.10.14
100000 routes in .900212 secs, 111084.93 routes/sec
Change-Id: I416b93f7684745099c1adb0b33edac58c9339c1a
Signed-off-by: Neale Ranns <neale.ranns@cisco.com>
Signed-off-by: Ole Troan <ot@cisco.com>
Signed-off-by: Paul Vinciguerra <pvinci@vinciconsulting.com>
don't do the setup and teardown in class methods so that with
each test the config is added and deleted. that way we test that
delete actually removes state.
more helpful error codes from VPP for existing IPSEC state.
Change-Id: I5de1578f73b935b420d4cdd85aa98d5fdcc682f6
Signed-off-by: Neale Ranns <nranns@cisco.com>